Lidar Survey added after site modelled |
Hi,
I'm struggling to add Lidar information to my original take off from PDF. The issue I have is that the original PDF's worked from were not aligned to Eastings and Northings and were automatically zero located. I have input all of the existing and proposed levels to gve me cut and fill for all of the components I would need. However, a Lidar survey has been taken of the site that gives a post demolition survey. The idea would be to introduce this after the existing topo and before the proposed levels. The issue I am finding is that when trying to add this into my scheme it locates to it's Eastings and Northings and I can't find a way to merge and integrate this information. The Lidar post demo survey would efectively replace the existing topo and adjust the proposed cut and flll accordingly. Suggestions on a post card, please.... Steve |
Messages In This Thread |
Lidar Survey added after site modelled - by Steve Keen - 07-07-2025, 05:51 PM
RE: Lidar Survey added after site modelled - by Ted Woods - 07-09-2025, 10:20 AM
|
Users browsing this thread: |
1 Guest(s) |